Module 19 2021

02/06/2021

Practical Implementation

Risk Control  Appropriate for reducing risk  Implementation of control in order

1. Safety by design

2. Protection mechanisms

3. Safety information and training

 As low as reasonably possible (ALARP – removal of economic consideration)

27

Practical Implementation

Risk Benefit  As low as possible still have some residual risk  Each residual risk must be evaluated against the benefit of using the device  Risk Benefit is continuously changing based on post market data  Overall risk acceptability

State of the Art

Intended Purpose

Clinical Benefit

Intended Use

Residual Risk

28

14

Made with FlippingBook flipbook maker