Module232025
07/05/2025
What is a deferral?
• A deferral allows for delay of initiation and/or completion of measure in relation to submission of the MAA • Must be justified on scientific and technical grounds or on grounds related to public health • e.g. Safety data required in adults before initiating studies in paediatric subjects , or paediatric studies will take longer to conduct than adult studies • To note: After MAA, annual reports on status of all deferred measures of the ongoing paediatric development must be submitted
The Organisation for Professionals in Regulatory Affairs
PIP Development
9
PIP strategy options
• Full development plan • Development plan with waivers for paediatric sub-sets and/or deferrals • Product Specific Waiver (PSW) = proposed waiver covering all paediatrics for the proposed condition • Class Waiver = EMA pre-defined list of classes of medicines and conditions for which the grounds of a waiver are deemed to apply – confirmation request still needs to be submitted via IRIS • Stepwise PIP (via Pilot)
The Organisation for Professionals in Regulatory Affairs
PIP Development
10
Made with FlippingBook Digital Publishing Software