Where to Test?  In the non-CQA world all steps could be tested since the important ones may not be known  Need to balance ‘perceived increased quality from testing’ against cost of: o Plant and laboratory resources o Increased cost of goods (API and product)  By concentrating on CQAs and hence Critical Steps resources are focussed on those aspects known (or suspected) to have the biggest potential impact on safety and efficacy

25

25

What to Test  Range of tests and acceptance criteria must be justified  Typical tests could include o End of reaction (disappearance of reactants, appearance of product, purity of product) o pH, water by KF  End of reaction could be off-line HPLC with all the problems of method development  All tests should do something positive to improve control of the process and not be testing for testing’s sake (to try to look good!)